Monday, December 10, 2012

Listen to the 2012 cantata

You can listen to an mp3 file of the 2012 cantata. This link will take you to the site with the 2 files.

Click HERE

Monday, October 15, 2012

Dedication!

On October 24, 2012 many of the Builders for Christ returned for our dedication.

Children's Choir video

Sunday, September 23, 2012

Special projects throughout church

It was a weekend for projects. Clark & Dave worked on putting the dividers in the restroom. Becky, Deb, Betty, and others helped bring back the fellowship hall. It has been years since it has not had classroom partitions! Gary, Bruce, Dave, Joe, Rich, Deb, Clark, Julie, Kelli, Don (& kids) were among the people shoving soil and rock. The west side is 75% done. Bruce also pulled up some drooping ceiling gridwork.



Monday, September 17, 2012

The first day Sunday School was in the new rooms

Our children say thank you to the Builders for Christ for providing them rooms for their classes!

Thursday, September 6, 2012

Some storm damage but the floor is underway

The heavy winds and rain ripped off some of the older shingles over the church entrance as well as tipping over the tent.  But the greater inconvenience was the water damage that came from the vent to the upstairs furnace. Tonna needs to improve their construction and get the job done!

We also have people putting in the floating tile in the north classrooms and one other room. Schneiders, Gary, and others had worked to clean the floors to have it ready for tile and carpet, which should go in this week.

Gene has the lights in the narthex completed!

Monday, September 3, 2012

Saturday, September 1, 2012

September 1 Update

  We had a small group at the addition today, finishing ceiling tiles, hanging lights, cleaning, and applying door finishes. Most of the floors will be installed IF we can get the floors clean.

Thursday, August 30, 2012

Some Neighbors (from everywhere) Who Came to Help

Besides the Builders for Christ and our church members, we had friends who helped us build the addition. I'd like to recognize some of those that I caught in photos.
Rich Schneider

Rosie Markham

Richard Markham

Kevin Doering

Trisha Engelbrecht

Curtis Engelbrecht

Richard Wolff

Curt Kephart

John, Trisha, Curtis, and Hally with Builders Curt & Judy Engelbrecht

Tuesday, August 28, 2012

So What's Going On?

Gene is hooking up lights today. Bruce helped him hoist them into place so Gene could complete the electrical connections. Ken has been working on the molding around the windows and doors. The HVAC people have a few more rooms done so ceiling tiles can be placed in them.

Saturday, August 25, 2012

The BFC Workers

I'm not sure if this list is complete and I will have a future post with other volunteer workers from the area. If I made an error in a name, please write a comment so it can be corrected.


















Tom & Chris the last to leave

Tom and Chris worked hard to get all of the suspended ceiling grids up on Friday with the help of Gary, Rich, and Bruce.  We were so happy that they made the commitment to get those up before they left. I know that they needed to be back to their family on Saturday. However, their camper did not want to leave us. Tom needed both his charger and a jump from his car to get it started. Dale from BFC showed up on Saturday morning to pick up one of the BFC campers. Lots of the wall outlets were installed today and a little more cleanup took place.

Thursday, August 23, 2012

Goodbye John & Barb, Fred & Joyce, Dennis, Ron & Barb, Richard

  It was hard to say farewell to our special brothers & sisters as they pulled out. Martin & Rose left very early and a small crew packed up the BFC tool trailer.
  Tom & Chris are sticking around on Friday to help with our ceiling grids. The two of them were trying to teach Bruce on Thursday night the finer points of installation in case things don't get finished on Friday.
They are spending the night with Meihaks.

Wednesday, August 22, 2012

A Message from our Builders for Christ Project Managers

Consider becoming a Builder for Christ.
 The HVAC people are almost done. The ceiling grids are in most of the classrooms and might be finished by Friday. (Thank you, Tom & Chris!) The camp site will be taken down over the next 2 days. Fred has almost completed the tiling project in the new restroom. The clothes are being washed for the trips home. Gary is painting store rooms.  Gene is wiring the lights.





Tuesday, August 21, 2012

the final week WITH builders

   It is both a sad and joyous week. We have been blessed with having Builders for Christ with us for almost 12 weeks. Martin, Rose, Ron, and John have been here for the duration while Tom, Chris, and the two Barbs almost as long. This week we will say "until we meet again". Martin has been sure that he hands out the volunteer registration forms so that our members know that they can come to future sites to work together again.
   Martin has managed to have mashed potatoes three weeks in a row but his chocolate chip cookie supply has run out.
    While the builders depart, the members realize that the work is not finished. It is now up to he local membership to complete the finishing touches. Gary, Pastor, Deb, and Bruce have done a lot of the final painting this week but there will still be touch ups to do. Remember, if you criticize the job, you will be handed a paintbrush! Richard, Dennis, Tom, Chris, and others have been working hard on the ceiling tiles but they will not be finished since there are still some ceiling ducts to install. Gene is installing lights. Fred is doing well on the tiling in the restrooms. The ladies have done an excellent job on staining and sealing but our members will need to put on the poly. The concrete people are working on the new steps.





Sunday, August 19, 2012

Freckles comes to church

I recently was reviewing our photos of the Builders and someone said that we were missing a picture of Freckles, Ron's hearing-assist can-do-canine. Freckles was always a hit with the kids. It was our last Sunday with the Builders.  Thank you for their work.

Friday, August 17, 2012

Weekly Update & Fish Fry

John Bubolz gives the weekly update on what has been accomplished as well as preparing the fish for our final fish fry of their visit. This will be their final weekend in Kasson.
Fred and Joyce Kuehl came from Litchfield to help install the tile in our restrooms.



Thursday, August 16, 2012

Sparky gets a second nickname & Chris has a birthday

This week has seen more progress on the finishing touches. More of the ceiling grid is in place and a few of the lights are going up with them. Carol, Cindy, and others have been painting. The duct work is still not quite done so we need to wait on 3 rooms yet. Norman Melcher is here from Watertown for a few days to install doors. This weekend is his 50th wedding anniversary so we wish them much happiness. Ken is giving him some help. Chris is celebrating a birthday this week.  Fish Fry tomorrow night so please sign up and bring a dish to pass.
We had a visitor from off the street come in for a visit this week since she had noticed all of our activity. Sparky almost gained a second nickname this week by putting his foot through the ceiling in Pastor's office. No injury except to his pride. But someone mentioned the nickname "Bigfoot"